Concrete Wall ConstructionProject-Specific EngineeringModel Home Q1 2027$750,000 Pre-Seed Round Open

Investor Overview

An early position in a proven construction platform

Coastal Monolithic is raising a $750,000 pre-seed round to build a 3DCP construction platform for Southwest Florida's $60B+ market. The model home targets a Q1 2027 break-ground in the Englewood / Port Charlotte area. The Innovation Enclave is a future phase: a planned 20 to 25 unit residential cluster in Southwest Florida with no set timeline.

Timeline current as of October 2026.

Florida's homebuilding model is broken at exactly the wrong moment

The state with the highest hurricane exposure in the continental US is still building the majority of its homes from wood: slow, expensive, labor-dependent, and structurally mismatched to escalating coastal risk. The insurance market knows it. Homeowners feel it. The construction industry hasn't caught up.

1 in 2

Florida homeowners now seriously considering leaving the state due to insurance and housing costs (FAU, Nov 2025)

Demand destruction risk
$112.9B

Damages from Hurricane Ian alone (2022): the costliest hurricane in Florida history (NOAA/ASFPM, finalized 2025)

Single-storm loss event
$225B+

Combined damages from hurricanes Ian, Milton, and Helene in a 24-month window

Accelerating loss trend
01

Wrong material for the risk

Wood frame remains the most common residential assembly in the US, a method not optimized for sustained hurricane wind loads, storm surge, and chronic humidity. Coastal Florida builders have been using a material that is not designed around the exact conditions the market demands.

02

Too slow for demand

Traditional residential construction in Florida averages 12-18 months from permit to completion. Labor shortages have pushed that further. With approximately 879 net new residents moving to Florida each day (Florida TaxWatch, Q2 2025 forecast), the construction pipeline cannot keep pace, driving prices up and housing quality down.

03

Labor costs spiraling

Skilled framing labor is increasingly scarce and expensive across Southwest Florida. Contractors report 30-45% labor cost increases since 2020. The skilled trades shortage is structural, not cyclical, and it will get worse as the construction workforce ages without sufficient replacement.

04

Insurance forcing a reckoning

Florida insurance premiums are the nation's highest, nearly four times the national average, and multiple major carriers have exited the state entirely, leaving homeowners with Citizens Insurance or lapsed coverage. This is accelerating demand for construction methods that qualify for lower premiums.

"Florida doesn't have a natural disaster problem. It has a construction materials problem. The hurricane hasn't changed. The home has to."- Coastal Monolithic, company perspective

Project-specific engineering. Model home Q1 2027.

Coastal Monolithic is building a 3DCP construction platform for resilient residential housing in hurricane-exposed markets, starting in Southwest Florida. Each project's wall system is engineered project by project, brought together through Florida-compliant engineering and local plan review.

The model home targets a Q1 2027 break-ground. The Innovation Enclave is a future phase of the platform, with every unit an engineered concrete structure.

Florida's insurance crisis is forcing a reckoning. Premiums are the nation's highest, nearly 4x the national average, and multiple carriers have left the state entirely. Concrete construction is what insurers, buyers, and developers are asking for. Coastal Monolithic is positioned to deliver it at scale.

The model home de-risks permitting, workflow, cost structure, and market demand. Success builds the foundation for the Innovation Enclave and regional expansion across the Florida residential market.

This is an early-stage opportunity at the intersection of construction technology, climate adaptation, and coastal real estate, in one of the fastest-growing, highest-risk residential markets in the US, with a wall system engineered for coastal conditions and brought together project by project.

Concrete Wall Construction
One continuous printed concrete wall system; the wider assembly is engineered per project.
Designed for Coastal Conditions
Wall chemistry and geometry developed for salt air, humidity, and the storm exposure that defines Southwest Florida.
Project-Specific Engineering
Structural design developed for the actual loads at each site, including gravity, wind, and the requirements of the local jurisdiction.

A category validated at scale before Coastal Monolithic was founded

The additive concrete construction category has already been demonstrated in real-world deployments across defense, government, and private residential markets. The platform and wall-system approach Coastal Monolithic is pursuing has established permitting pathways, independent code evaluation, and occupied residential deployment history in multiple US markets. Coastal Monolithic's work is local execution: permitting, workflow validation, and market adoption in Southwest Florida. The company is commercializing a proven category, not inventing one from scratch.

Concrete

Continuous insulated concrete wall system that reduces heating and cooling demand versus traditional assemblies.

Coastal

Wall design developed for salt air, humidity, and storm exposure.

Documented

Track record of completed structures in North America, delivered by the technology platform we deploy

Delivered by our technology platform partner, not by Coastal Monolithic.

High-Strength

Concrete mix engineered for coastal performance

Hurricane-Rated

Wind design target for wall systems (verified per project)

Site-Specific

Engineering developed for the actual loads at each project location

Prior validation: the broader category

NASA

Lunar habitat construction research: additive concrete printing validated for extreme structural environments under agency engineering review.

US Army Corps of Engineers

Occupied, code-compliant residential structures deployed on active military installations using additive concrete construction methods.

Department of Defense

Advanced construction technology programs deploying additive concrete at field scale, with structural performance verified on active installations.

DARPA

Automated construction technology research using additive methods, validated against demanding engineering and materials standards.

Residential developers

Residential deployment across Texas, California, Mexico, and international markets, delivered by the technology platform Coastal Monolithic deploys. This is prior real-world deployment by the platform, not by Coastal Monolithic.

The wall design is engineered project by project, brought together through Florida-compliant engineering and local plan review. The underlying technology has also been validated on US military bases, investigated for lunar colonization, and used to deliver homes in competitive private residential markets. Coastal Monolithic's role is execution in Southwest Florida: permitting, workflow, and platform deployment in a market where the demand case is structural.

Discuss your project's engineering requirements
Aerial view of Florida residential development at scale

A large market that is not being served

$900B+
US residential construction market annually
$60B+
Florida residential construction market annually
22.6M
Florida population, growing by ~879 net new residents per day
1,300+
Miles of Florida coastline at hurricane risk exposure
Florida coast at golden hour with storm approaching

The technology is proven. The deployment is early.

01

The technology works

Large-scale concrete printing has been validated globally. Regulatory pathways exist. The platform is ready to use.

02

Almost nobody is running it as a business

Most printed homes so far are one-off demos. Very few operators are building repeatable, private-market residential projects. That gap is the opportunity.

03

Five pressures are hitting Florida at once

Hurricane exposure, the insurance crisis, the labor shortage, migration demand, and regulatory momentum are all landing here at the same time. That alignment is rare.

Why Southwest Florida first

$112.9B
Hurricane Ian damages, 2022
879
Net new FL residents per day
18mo
Traditional residential build timeline, average

Florida isn't one market force. It's five converging at once. No other US state combines hurricane exposure, insurance crisis, labor shortage, migration demand, and regulatory momentum at this scale.

The post-Ian and post-Milton reckoning sped up what was already coming. Buyers, insurers, developers, and local governments are all pushing toward more resilient construction. Concrete is the answer. Speed and cost are the barriers. 3D printing removes both.

Cape Coral, Fort Myers, and Naples are among the fastest-growing cities in the US. Southwest Florida is also the most hurricane-exposed major population center in the continental US. The demand for better-built homes isn't speculative. It's structural.

01
Hurricane exposure
Highest sustained exposure of any major US population center
02
Insurance crisis
Premiums 4× national average; carriers exiting the market
03
Labor shortages
Skilled framing labor scarce and +30 to 45% more expensive since 2020
04
Migration demand
One of the fastest-growing states in the US, per Florida TaxWatch 2026 projections
05
Post-storm urgency
$225B+ in damages from Ian, Milton, and Helene accelerating rebuilding demand

Done right beats done first.

The race to print first is over. The race to build well hasn't started. Coastal Monolithic exists to win the second one: Florida engineering, honest permitting, real insurance conversations, and a finished home you'd be proud to show. We're building the moat right now, and the model home is the first brick.

Better structure. Faster build. Compelling economics.

3D printed concrete delivers a measurably stronger, faster structural shell compared to conventional concrete block construction: the dominant method in coastal Florida. The model home validates these economics in the Southwest Florida market.

Performance comparison

Structural shell timeline

Conventional

5-8 weeks

3D Printed

5-7 days

~10x faster

Full build cycle

Conventional

12-18 months

3D Printed

6-9 months

~40% faster

Wind resistance rating

Conventional

130-160 mph (code min.)

3D Printed

Hurricane-rated, above code minimum

Exceeds code minimum wind resistance

Structural joints

Conventional

Mortar joints (failure points)

3D Printed

Monolithic, no joints

Superior integrity

Labor dependency

Conventional

High: skilled framing crews

3D Printed

Low: automated system

Reduced schedule risk

Post-storm repair cost

Conventional

$180+ / sq ft avg (Hurricane Ian data, published estimates)

3D Printed

Engineered to remain structurally intact under hurricane-force wind loads

Actual post-storm performance depends on full assembly, roof system, and site conditions

Model home: projected unit economics

The model home is a single-family home in Southwest Florida, designed to establish baseline economics for the platform.

Land & site35%
Permitting & engineering10%
Construction & printing40%
Fit-out & finishes15%

Illustrative cost allocation. Actual breakdown subject to site selection and market conditions.

Home size~2,300 sq ft
All-in model home budget$250K to $350K
ScopeLand, permitting, print, finish
SW Florida concrete home comparables$500K to $650K+
Target gross margin (model home)$100K to $200K+
Full build cycle target6 to 9 months

Platform economics improve with scale. As the printing crew becomes more efficient, permitting precedent is established, and material supply chains are optimized, cost-per-shell decreases while margins expand. The model home is the floor, not the ceiling.

ICON Titan robotic gantry printer at sunset on an active 3D concrete printing job site

From proving ground to community-scale deployment

Phase 1

The Proving Ground

A single-family home in the Englewood / Port Charlotte area. Model home break-ground targeted for Q1 2027. The model home tests the full cycle: permitting, construction workflow, cost structure, and buyer demand in the live Florida market. Project scope, and the costs that go with it, are confirmed per project; see the dedicated cost page for the current planning estimate.

Q1 2027 Model HomeProject-Specific EngineeringDesigned for Coastal ConditionsPipeline Open
Phase 2

The Innovation Enclave

A 20 to 25 unit residential cluster in Southwest Florida. Every unit is an engineered concrete shell, brought together through Florida-compliant engineering and local plan review. Builder partnerships forming. Capital partners can participate in project-by-project structures with a defined scope and exit pathway.

20 to 25 UnitsProject-Specific EngineeringBuilder Partnerships FormingEnclave: Future Phase
Phase 3

Regional platform expansion

Scale operations across Florida and into adjacent hurricane-exposed coastal markets. Build a repeatable construction platform with multiple concurrent projects, a growing builder-partner network, and improving platform economics through process maturity and supply chain optimization.

Florida CorridorBuilder PartnershipsPlatform Scale

The Innovation Enclave: the most concrete proof point in the platform

Full Enclave Details

The Innovation Enclave is a future phase of the Coastal Monolithic platform: a potential residential cluster in Southwest Florida. It is a future possibility with no set timeline.

Every unit in the Enclave is an engineered concrete shell planned to be delivered through partnerships with local builders. The printed concrete wall is the proposed scope; the wider assembly is engineered per project.

For investors, the Enclave is a future possibility, not a scheduled project. It follows a successful model home. Site selection and builder partnership conversations are exploratory at this stage.

The Enclave is also the platform's most visible proof point: a concentrated deployment of the technology at community scale, in a market where insurance costs and storm risk are reshaping buyer demand. It's the product that makes the investment thesis visible to the market.

20-25
Units
Concrete
Wall Construction
Automated
Wall Printing
Walls
Printed Scope
For Capital Partners
Project-by-project capital structures. Asset-light entry.
Continuous insulated concrete wall system that reduces heating and cooling demand.
Wall design developed for salt air, humidity, and storm exposure.
The printer will be secured as soon as the project has its backing in place. Permitting preparation is underway. Model home break-ground Q1 2027. Site selection and builder conversations active now.
Differentiated product in a market where insurance costs are reshaping buyer demand.
Active
Phase 1
Pilot SFR

Single-family home in the Englewood / Port Charlotte area. Tests permitting, workflow, cost structure, and market demand. Model home break-ground targeted for Q1 2027.

Pipeline Forming
Phase 2
Innovation Enclave

An engineered residential cluster. Every unit is a concrete shell brought together through Florida-compliant engineering and local plan review. Builder partnerships forming. Capital partners can join project-by-project structures with a defined scope and exit pathway.

Full Enclave Details
Planned
Phase 3
Regional Scale

Multi-market platform expansion across Florida and adjacent hurricane-exposed coastal markets. Build a repeatable construction platform with multiple concurrent projects, a growing builder-partner network, and better economics as the process matures.

Code-compliant. Insurable. Approvable.

The most common investor question about additive construction is regulatory. The permitting pathway exists. Project-specific engineering and local plan review provide the code compliance route for Florida building departments. Concrete structural systems may support more favorable underwriting outcomes relative to wood-frame alternatives, though results depend on full project design, carrier criteria, and site conditions. The Coastal Monolithic model home is designed to validate real-world permitting and insurance treatment in Southwest Florida specifically.

Engineering-Led Code Compliance

Building departments review alternative construction methods through project-specific engineering and local plan review. Coastal Monolithic will engage local building officials directly and will support the plan review process with project engineering documentation.

Permitted in Multiple US States

Additive concrete structures using this technology have been permitted in Texas, California, and multiple additional states. The permitting pathway exists. Coastal Monolithic will follow established precedents, adapting to Southwest Florida's specific building department requirements and engaging proactively with local officials.

Florida Building Code Pathway

Florida's building code is among the strictest in the US, particularly for high-wind construction zones. Each project's wall system is engineered for the requirements of its specific location, including the structural criteria applicable to coastal Lee and Collier County jurisdictions.

Favorable Insurance Treatment

Concrete structural systems are generally viewed more favorably by Florida insurance carriers relative to wood-frame alternatives. Homeowners with qualifying concrete structures may be eligible for wind-mitigation credits and more competitive premium terms. Final underwriting depends on full assembly, roof design, opening protection, location, flood exposure, and carrier criteria. Wind-mitigation benefits may strengthen the ownership-cost case, but final premium outcomes vary by project, insurer, and complete building specifications. The model home is designed to help establish real-world insurance benchmarks for this construction approach in Southwest Florida.

Published Florida analyses suggest qualified concrete structures may receive more favorable premium treatment relative to wood-frame alternatives. Actual premium outcomes depend on carrier criteria, full assembly design, opening protection, roof system, flood zone, and site-specific factors. No specific premium range is guaranteed.

Built right the first time is the most sustainable choice

3D concrete printing can reduce material waste, lower embodied carbon, and help eliminate the repeated rebuild cycles that make coastal wood-frame construction one of the most environmentally costly housing typologies in the US. Building a more durable structure the first time has the potential to be measurably better than repeated storm damage, repair, and reconstruction cycles. Resilience here is both a structural advantage and a compounding ESG outcome.

Material waste generated

Conventional construction100%
3D printed concrete38%

% of conventional

Water usage in construction

Conventional construction100%
3D printed concrete55%

% of conventional

Operational carbon over 50 years

Conventional construction100%
3D printed concrete42%

% of conventional

Expected structural lifespan

Conventional construction30%
3D printed concrete100%

% relative to 100-yr concrete benchmark

* Comparative figures based on published third-party lifecycle analyses for additive concrete construction vs. conventional residential methods. Actual results will vary based on system, mix design, site conditions, and building assumptions. These are not Coastal Monolithic-specific measured outcomes.

Less waste

than conventional framing, per published comparative estimates

Precision material use

Additive manufacturing deposits concrete only where structural analysis demands it: no offcuts, no overpour, no site waste from miscutting or forming. Published comparative analyses of additive concrete construction suggest material waste can be significantly reduced relative to conventional framing and masonry methods, where site waste of 25-40% is commonly cited. Results depend on system configuration, mix design, and project conditions.

up to 10%

lower embodied carbon with Portland limestone cement, depending on mix design

Low-carbon mix design

The printing mix is engineered for performance: high compressive strength with supplementary cementitious materials including fly ash and ground granulated blast-furnace slag (GGBS), both post-industrial byproducts. Portland limestone cement (PLC) can reduce embodied carbon by up to 10% over standard OPC with no performance tradeoff, depending on mix design and application.

100 yr+

structural design life, vs. 25-35 yr wood-frame in coastal Florida

Resilience as environmental stewardship

Every hurricane that destroys a wood-frame home triggers a full reconstruction cycle: demolition waste, landfill loading, new material production, and site activity. A high wind-rated monolithic concrete structure designed to survive major storms has the potential to eliminate that cycle. Building one durable home is an exponentially lower lifetime environmental burden than repeated rebuilds.

~40%

lower projected lifecycle carbon, per published comparative analyses of additive concrete

Reduced long-term maintenance cycles

Concrete does not rot, warp, or delaminate in Florida's humidity and saltwater air. Wood-frame structures in coastal environments require ongoing maintenance, partial replacement, and full replacement after major storm events. Published lifecycle analyses suggest concrete structures can have meaningfully lower material consumption and embodied carbon over full lifecycle, depending on mix design and site assumptions.

For ESG-oriented investors

ESG disclosure

Coastal Monolithic's construction approach is designed to deliver improvements across all three ESG dimensions: environmental (waste, carbon, materials), social (housing resilience, insurance access), and governance (transparent permitting, code compliance, independent evaluation).

Climate risk mitigation

Institutional LPs and family offices increasingly screen for climate-aware portfolio construction. Investing in resilient, low-waste coastal construction directly addresses physical climate risk in one of the most exposed residential markets in the US.

Insurance implications

A home that doesn't flood, blow apart, or require post-storm reconstruction is a materially better insurable risk. The potential ownership cost differential between concrete and wood-frame construction, where applicable, is a financial expression of the environmental and resilience thesis.

Less waste

than conventional framing, per published comparative estimates

~40%

Lower projected lifecycle carbon, based on published comparative analyses of additive concrete vs. conventional construction

100+ yr

Structural design life: eliminating repeated post-storm rebuild cycles

From formation to break-ground: a clear path

The company is pre-construction. The groundwork has been laid: technology partner secured, market identified, investor conversations underway. The next milestones are equipment acquisition, permitting, and break-ground on the model home.

CompletedDone

Company formation and technology partner secured

Coastal Monolithic LLC formed. Technology licensing and printing platform partnership established with a proven provider with a documented track record of completed structures in North America.

CompletedDone

Market research and beachhead selection

Southwest Florida identified as primary market based on storm exposure data, insurance cost analysis, housing demand metrics, and competitive landscape assessment.

CompletedDone

Engineering approach and workflow defined

The wall design and construction workflow are defined project by project. We are glad to discuss engineering requirements on request.

CompletedDone

Initial investor conversations underway

Pre-seed investor discussions active. Investor overview document in preparation. Pipeline of qualified investor interest building.

In ProgressActive

Model home site selection

No lot is locked yet. Evaluating land options across Southwest Florida for the single-family home, where build-ready lots are widely available and affordable. Site selection criteria include permitting jurisdiction, lot geometry, and comparables market.

When funded

Equipment acquisition

Acquire and stage the robotic printing system. Finalize vendor agreements and align capital for the print program. This is the first hard commitment in the plan.

Q1 2027

Permitting

Permitting preparation begins, supported by project-specific engineering and local plan review. Coordinate with the county building department and finalize the model home design for print.

Q1 2027

Model home break-ground

Mobilize printing equipment to the model home site in Southwest Florida. Begin structural wall printing, targeting 5 to 7 days for full structural shell completion.

Future, no set timeline

Innovation Enclave (future phase)

A planned 20 to 25 unit residential cluster. The Enclave follows a successful model home, not a calendar date. Builder and developer conversations are exploratory at this stage.

View Enclave Details
Future

Multi-market platform scale

Regional platform operations across Florida and adjacent hurricane-exposed coastal markets. Multiple concurrent projects, an established builder-partner network, and improving platform economics through process maturity and supply chain optimization.

Investor pipeline

Early-stage investor conversations are active. Letters of intent and formal commitments are in progress. The round is being assembled to fund the model home construction and initial operational infrastructure. Investors who engage early will have the opportunity to establish position at pre-construction terms.

Let's build something together
Jack Gibbons, Founder of Coastal Monolithic
Jack Gibbons
Founder, Coastal Monolithic
Connect on LinkedIn
"Florida's housing market has a structural problem. The answer is structural concrete."

Jack Gibbons knows construction from both sides of the deal: managing the work and investing his own money. He has personally owned and flipped approximately 30–40 homes and completed more than 50 additional projects as general contractor for other investors. His background includes rental ownership, approximately seven years as a licensed general contractor in Colorado, and eight years in technology and IT. Coastal Monolithic brings that experience together around a practical goal: build an excellent house at a price that makes sense.

Coastal Monolithic is Jack's direct response to the post-Ian and post-Milton reality. Homeowners pay record insurance premiums for homes that are structurally mismatched to the risks those premiums are supposed to cover. The company is built on a simple conviction: the next generation of coastal housing must be built from concrete, not wood. The technology to do it faster, cheaper, and with better engineering than traditional methods now exists and is ready to deploy.

Jack leads all investor relations, builder partnerships, and model home operations, supported by a full-time founding team that is hands-on with the printing technology. He is the primary contact for all investor inquiries and is available for direct conversations with qualified capital partners.

Concrete foundation construction at night with dramatic lighting

What the early-stage round funds

Coastal Monolithic is raising a $750,000 pre-seed round to fund the priorities below.

01

Model home execution

Land acquisition, permitting fees, construction, and finish work for the Southwest Florida model home. The model home is part of a broader capitalization strategy that includes equipment, operating infrastructure, and working capital. Details available in the full investor overview.

02

Partnership development

Build relationships with regional builders, developers, land partners, and material suppliers. These are the commercial relationships that make a repeatable project pipeline possible after the pilot validates the model.

03

Platform foundation

Build the operational infrastructure: construction sequencing protocols, supplier agreements, quality control systems, and workflow documentation. This is what makes the model repeatable across multiple projects.

Risks Disclosed Openly

Coastal Monolithic discloses the following risks openly. Each is actively mitigated. Investors evaluating this opportunity should review these alongside the upside thesis.

Risk 1 of 5

Permitting and Code Adoption Risk

Florida building departments are still developing familiarity with large-scale 3D concrete printing as an alternative construction method.

Mitigation

Alternative construction methods are reviewed through project-specific engineering and local plan review. Coastal Monolithic will engage local building officials proactively in advance of submission.

Risk 2 of 5

Technology Platform Dependency

Coastal Monolithic operates as a licensee of a third-party additive construction platform. A material disruption in that relationship could affect operations.

Mitigation

Licensee structure with a platform partner that has a documented track record across North America. Coastal Monolithic monitors the broader 3DCP technology landscape and maintains optionality across qualified additive construction platforms.

Risk 3 of 5

Capital and Execution Timeline Risk

Coastal Monolithic is pre-construction. Capital is required to complete the model home, validate Florida market conditions, and reach the future Innovation Enclave phase.

Mitigation

Staged capital deployment tied to milestone gates; model home scoped with conservative budget and contingency; the Enclave designed to be funded through project-level SPVs rather than balance-sheet capital.

Risk 4 of 5

Insurance and Buyer Acceptance Risk

Insurance underwriting and buyer financing for 3D printed concrete homes is still maturing in Florida. Wind mitigation credits, appraisal comparables, and lender familiarity will improve with completed inventory.

Mitigation

Model home designed to formally document insurance treatment and establish appraisal precedent for concrete construction. Engineering developed for coastal conditions supports stronger wind mitigation treatment under Florida's rating system.

Risk 5 of 5

Market and Macro Risk

Florida residential demand is currently driven by inbound migration and post-storm rebuilding. A material shift in either could affect absorption.

Mitigation

Coastal Monolithic targets a market segment defined by structural need (insurance crisis, hurricane risk) rather than discretionary upgrade demand. The concrete wall system addresses an underserved buyer profile that exists independent of broader housing cycles.

Disclosure

Additional risks are disclosed in the formal offering materials provided to qualified investors under NDA.

Request offering materials

This is not an exhaustive list of all risks associated with an investment in Coastal Monolithic. Additional risks and uncertainties not currently known to us, or that we currently consider immaterial, may also adversely affect the business. Prospective investors should conduct their own due diligence and consult with qualified legal, financial, and tax advisors before making any investment decision.

Questions investors ask

What is the Coastal Monolithic investment opportunity?

Coastal Monolithic is raising an early-stage round to fund its Southwest Florida pilot home and initial operations. The company is positioned at the intersection of Florida's hurricane risk and insurance crisis, acute skilled labor shortages in residential construction, and the maturation of large-scale 3D concrete printing technology. The total Florida new residential construction market exceeds $60B annually.

What stage is Coastal Monolithic at?

Coastal Monolithic is at the early stage. The company is developing its pilot project: a single-family spec home in Southwest Florida, to validate permitting, construction workflow, cost structure, and market demand before scaling to builder and developer partnerships.

What does the early-stage capital fund?

The early-stage round funds three areas: (1) Pilot home execution: land acquisition, permitting fees, construction, and finish work for the Southwest Florida spec home; (2) Partnership development: establishing relationships with regional builders, developers, land partners, and material suppliers; (3) Platform foundation: operational infrastructure including construction sequencing protocols, supplier agreements, and quality control systems.

What is the market size for hurricane-resistant construction in Florida?

The Florida residential construction market is among the largest in the US, within a $900B+ national market. Florida has 22.6M residents and is one of the fastest-growing states in the US, with 1,300+ miles of coastline at hurricane risk. National data shows most new single-family homes are wood-framed, an assembly that is not optimized for the hurricane-exposed coastal environment and that creates demand for resilient concrete alternatives.

How does Coastal Monolithic create value for investors?

Coastal Monolithic creates value through three phases: Phase 1 validates the full construction cycle with a pilot spec home; Phase 2 is planned to establish builder and developer partnerships for shell-printing services across Southwest Florida; Phase 3 scales operations regionally across Florida and adjacent hurricane-exposed coastal markets, building a repeatable construction platform with improving economics through process maturity.

Investor Overview: available on request

The full pitch deck covers the problem, solution, market size, business model, unit economics, team, traction, and financial projections. Sent directly to qualified investors.

Let's build something together
Problem & market
Technology validation
Unit economics
Business model
Team & advisors
Financial projections
Coastal landscape at twilight representing investment opportunity

Join us at the beginning

Concrete Wall Construction. Project-Specific Engineering. First print: model home, breaking ground Q1 2027. This is an early-stage opportunity to establish position in a proven construction platform before the category reaches scale.

Sources & Citations

All statistics cited on this page are sourced from publicly available third-party research and government data. Publication dates and source links are provided below for independent verification.

[1]

FL Homeowner Insurance Premium - Nation's highest avg.

Florida remains the most expensive state for homeowner insurance in the US, nearly 4× the national average of ~$1,900.

Insurance.com·March 2026·Verify source
[2]

Hurricane Ian Damages - $112.9B+

Costliest hurricane in Florida history. Total economic losses finalized by NOAA and the Association of State Floodplain Managers.

NOAA / ASFPM·Finalized 2025 to 2026·Verify source
[3]

Homeowners Considering Leaving - 1 in 2 (50%)

FAU survey: 50% of Florida homeowners are "seriously considering" relocating due to insurance costs and housing affordability.

Florida Atlantic University (FAU)·November 2025·Verify source
[4]

Net New Residents - ~879 per day

Florida TaxWatch Q2 2025 forecast projects approximately 879 net new residents per day arriving in Florida through 2026.

Florida TaxWatch·Q2 2025 (2026 projection)·Verify source
[5]

Wood-Framed Share of US Single-Family Completions - 93% (2023)

National figure: wood framing accounted for about 93% of US single-family home completions in 2023. This is a national statistic, not a Florida-specific percentage.

NAHB (Eye on Housing)·August 2024·Verify source
[6]

US Housing Shortage - 3.7 Million Units

Freddie Mac estimates a 3.7 million unit deficit in the US housing supply, the most widely cited current figure for the national shortage.

Freddie Mac Research·Updated late 2024 / early 2025·Verify source
[7]

3D Printed Structures Deployed: Documented Track Record

A documented track record of completed discrete structures in North America, delivered by the technology platform we deploy. A larger figure is sometimes cited by counting individual units within multi-unit structures (for example, barracks); the discrete-structure count is the conservative, defensible one.

ICON Projects Newsroom·2026·Verify source

Important Notice

This page is for informational purposes only and does not constitute an offer to sell, or a solicitation of an offer to buy, any securities. Any offering of securities by Coastal Monolithic LLC will be made only pursuant to a formal offering document and in compliance with applicable federal and state securities laws, including any applicable exemptions under Regulation D or other available exemptions. No money or other consideration is being solicited at this time, and if sent in response to this page, will not be accepted. No offer to buy securities can be accepted and no part of the purchase price can be received until an offering statement is filed and only through an offering document. This page has not been reviewed or approved by the U.S. Securities and Exchange Commission or any state securities regulator.

Technology Platform Disclosure

References on this site to third-party evaluations, wind resistance testing, prior permitted structures, and homes delivered in North America reflect data associated with the third-party additive construction platform that Coastal Monolithic has engaged as its technology partner. Coastal Monolithic is an operator and licensee of this platform, not the developer of the underlying technology. Performance data and deployment history cited herein are attributable to the platform provider and prior deployments using that system. Coastal Monolithic has not independently verified all third-party data. Project-specific results will depend on design, engineering, jurisdiction, site conditions, and execution.

Certain performance references, comparative metrics, and validation examples on this page reflect broader additive construction category data, third-party evaluations, published analyses, and prior system-level deployments. Project-specific results, approvals, insurance outcomes, timelines, and economics will vary based on design, engineering, jurisdiction, site conditions, carrier criteria, and execution.